The JKBZ-III testing system uses manual control methods such as buttons and conversion switches to complete the entire testing process. During the testing process, the conversion switch is used to select the test items and the gear selection of the voltage and current transformers. The buttons are used to start and stop the circuit.

The JKBZ-III testing system uses manual control methods such as buttons and conversion switches to complete the entire testing process. During the testing process, the conversion switch is used to select the test items and the gear selection of the voltage and current transformers. The buttons are used to start and stop the circuit.
Introduction to Measurement and Control System:
1. The control system is completed by conversion switches and buttons, and all test data is measured and displayed by power analyzers and digital instruments.
2. The appearance of the test bench is simple and elegant, easy to operate, and the test personnel can easily master the operation process after simple training.
3. The power analyzer adopts high-performance DSP technology, pure resistance sampling, and the same principle as the power analyzer, which can be used for measurement in low power factor testing scenarios.
4. It can automatically perform waveform distortion correction, temperature correction (75, 120, 145) ℃, voltage correction (no-load test under non rated voltage), and current correction (short-circuit test under non rated current conditions), which is very suitable for testing needs under non rated current conditions.
5. There is a mechanical emergency stop button on the test bench to ensure the safety of personnel, equipment, and test subjects in case of emergency.
Experimental ability:
1. Can meet the requirements of oil immersed transformers with capacities of 63000KVA, 110Kv and below (including S9S11S13 and amorphous alloy transformers);
2. Can meet the requirements of dry-type transformers with capacities of 31500KVA, 35Kv and below;
3. Can meet the requirements of mining explosion-proof transformers with capacities of 6300KVA, 10KV and below;
4. Special transformers (detailed capacity and voltage level must be provided when ordering).
Experimental project:
1. Transformer winding resistance test
2. Measurement of Voltage Ratio and Testing of Connection Group Number for Transformers
3. Transformer no-load current (%) and no-load loss test
4. Transformer short-circuit impedance (%) and load loss test
5. Power frequency external withstand voltage test of transformer
6. Transformer induction withstand voltage test
Scalable experimental projects:
1. Partial discharge test of transformer
2. No load harmonic test (0-31st harmonic)
3. Voltage withstand test of transformer oil (0-80Kv)
4. Transformer temperature rise test (can automatically draw temperature rise curve)
5. Insulation resistance test
6. Transformer anti-interference dielectric loss test
7. Lightning impulse test.

Baoding Jinke Hui Electronic Co. Ltd.

Phone:0312-3268050

Email:jkh200888@126.com/ bdjkh@bdjkh.com

Url:http://www.sanjin.net

Address:China, baoding high-tech zone, road no. 123 of hua wei control mechanical and electrical industrial park 1-401

Mobile station

Copyright © Baoding Jinke Hui Electronic Co. Ltd. All Rights Reserved  冀ICP备19023900号-1   Web site productionSanjin
HomePhoneProduct